| Year
2008 |
| Client |
J.Ray McDermott Far
East Inc (JRMFEI) |
| Scope of Work
|
Provision of Coating
Inspector |
|
| Year
2008 |
| Client |
Germanischer Llyod
industrial Services (GL Vietnam) |
| Project location |
Ca Ngu Vang WHP Project
for Hoan Vu Joint Operating Company (HV JOC) |
| Scope of Work
|
Provision of Safety
Personnel -QA/QC Services for Pipeline and Offshore Operation. |
|
Year
2008
|
| Client |
Swiber Offshore
Construction Pte Ltd |
| Project
location |
Hybrid Rentis Pipeline
Installation for Murphy Sarawak
24" x 33KM x 2 lines, 24" x 2.18KM x 2 lines and 20" x 4.2KM |
| Scope
of Work |
Subcontract
services for the supply of equipment, personnel and materials for the
application of HDPUF for pipeline field joint-in fill. |
|
Year
2008
|
| Client |
Kencana HL Sdn Bhd |
| Project
Location |
MOC -Golok Substructure |
| Scope
of Work |
Subcontract
services for the supply of equipment, personnel and materials for the
application of HDPUF for riser field joint in-fill and Heat Shrink Sleeves (HSS) for riser field joints. |
|
Year
2008
|
| Client |
Barmada McDermott |
| Scope of Work
|
Provision of Inspection Personnel for M3S Pipe Project for Sarawak Shell Berhad. |
|
Year
2008
|
| Client |
Jindal Saw Ltd-Valentine Maritime Ltd |
| Project Location |
Takula Gas Processing Platform for Chevron |
| Scope of Work
|
Subcontract services for the supply of personnel and materials for the application of HDPUF for riser field joint in-fill. |
|
Year
2008
|
| Client |
Swiber Offshore
Construction Pte Ltd |
| Project Location |
West Madura and Poleng
Fields for Kodeco, Indonesia - HDPUF In Fill Coating for the Pipeline
Field Joints. |
| Scope of Work
|
Subcontract services
for the supply of equipment, personnel and materials for the
application of HDPUF for pipeline field joint in-fill. |
|